Pine Grove Dumpster Rental Call (754) 328-1022
HomeBoca RatonConstruction Dumpster

Construction Dumpster Rental in Boca Raton, FL

Job-site boxes for Boca Raton, FL crews: 20 to 40 yards, real tonnage allowances, swap-outs that show up the day you call. Concrete, lumber, drywall, mixed loads - priced flat so your bids stay accurate.

(754) 328-1022
Construction dumpster on a Boca Raton job site

The straight version

Demo weeks and finish-out weeks fill boxes differently. Tell dispatch which phase you are in and we will size the box and the swap schedule to match, so you are not paying to haul air or waiting on a full container.

Recommended setup: 20 to 40 yard, with swap-out service for active sites. Questions cost nothing: (754) 328-1022.

Size it in one look

10 yard dumpster

12' x 8' x 4' · ~3 truck loads

Best for: single room, roofing

$395-$525

Flat rate with delivery, pickup, and the weight allowance included.

Full 10 yard details →

Loaded 20 yard dumpster in Boca Raton, FL

20 yard dumpster

22' x 8' x 4.5' · ~8 truck loads

Best for: remodels, cleanouts

$475-$675

Flat rate with delivery, pickup, and the weight allowance included.

Full 20 yard details →

Loaded 20 yard dumpster in Boca Raton, FL

30 yard dumpster

22' x 8' x 6' · 6-8 truck loads

Best for: whole-home renovation

$600-$775

Flat rate with delivery, pickup, and the weight allowance included.

Full 30 yard details →

Construction dumpster on a Boca Raton, FL job site

40 yard dumpster

22' x 8' x 8' · 8-10 truck loads

Best for: construction, demolition

$675-$895

Flat rate with delivery, pickup, and the weight allowance included.

Full 40 yard details →

Construction dumpster on a Boca Raton, FL job site

Street placement in Boca Raton has rules - the local permit guide covers the office, the process, and the fees. Item questions? What can go in.

Asked constantly

Box is full mid-project - now what?

Swap-out: full box leaves, empty box lands, usually inside a business day. Billed as its own rental.

Do contractors get accounts?

Standing schedules, priority swaps, consolidated monthly invoicing. Most of our route volume is repeat builders - ask dispatch for contractor terms.

Concrete and brick?

Yes, in a dedicated heavy-debris box loaded level to the rail. Never mix masonry into a big container - the scale finds it every time.

What if my load is heavy?

Each size carries an included tonnage (2 to 5 tons by box). Go over and you pay the facility's per-ton rate - passed through, not marked up.

Last updated August 2026 · local rules and rates checked for Boca Raton and nearby cities.

One call gets the box moving.

(754) 328-1022
Call Now